When do I need a building permit? |
The following are a few common projects that require a building permit:
You do not need permits for the following:
For a more detailed list on when a permit is or isn't required, please reference our comprehensive, but not exhaustive guide. If you are unsure if you need a permit, please phone our office at 905-436-5658. |
How do I apply for a building permit? |
You must fill out our permit application form, submit it along with your permit plans and pay a permit fee. An owner's authorization form will be required if you are not the property owner. Permit Applications: Apply by email at [email protected]. Please allow for two business days after sending in a permit application to receive a response from our staff on acceptance and how to contact us for payment. Paper Applications: Paper building permit applications will still be accepted for minor projects, however: there will be a delay in their review due to COVID-19 isolation and then the conversion to digital. We encourage applicants to submit digital documents for faster service. Most of our staff are currently working from home, but have access to both email and voicemail. |
What type of permit plans are required? |
Permit plans must be drawn-to-scale showing the proposed work so that staff can make sure your proposed work meets all applicable by-laws and regulations. Most projects will require a copy of your current plan of survey or a site plan (a hand-drawn likeness is acceptable). Site plans must show the property lines with dimensions of driveways and existing and proposed buildings. You may need to have an Architect, Professional Engineer, or a Designer who is qualified with a Building Code Identification Number (B.C.I.N.) to draw your plans. |
How long does it take to obtain a building permit? |
Building permit application processing depends upon:
Processing times for complete applications vary depending on the type of construction. Our Building Permit Services staff are here to help guide you through the application process but cannot act as your designer. |
What fees do I need to pay when I apply for a building permit? |
You will need to pay your permit fee when you apply. We accept cash, cheque (payable to the "City of Oshawa"), debit, Visa, MasterCard or American Express. Other fees may apply based on the scope of the work. We will let you know when you apply for your permit. You must pay these fees before we can issue your permit. |
Forms, Building Guides, Example Drawings and Permit Fees |