Road and Sidewalk Closures
Search

Metrolinx Notice: Soil characterization work at Farewell Street Bridge
Posted on Thursday, June 26, 2025 03:35 PM
Metrolinx is preparing for the future Bowmanville Extension project, which will extend Lakeshore East GO rail service through Central Oshawa to Courtice and Bowmanville.
Why: XS Soil Solutions Inc. and its subcontractor (Strata Drilling Group) will be at Farewell Street Pedestrian Bridge conducting soil characterization sampling. This geotechnical investigation is critical to help inform the design and construction planning of future infrastructure upgrades that will improve transit in your...
Canada Day Celebration Road Closure
Posted on Thursday, June 19, 2025 10:54 AM
Road closures in effect for the City of Oshawa's Canada Day Celebration, including Simcoe St., Valley Dr., and Lakeview Park Ave.
When: July 1, 2025, beginning at 7 a.m. until 12 a.m.
Where: Impacted roads include Simcoe St., south of Harbour Rd., Valley Dr., from Ritson Rd. to Simcoe St., and Lakeview Park Ave., from Ritson Rd. to Simcoe St.
Why: City of Oshawa's Canada Day Celebration
Road Closure: Conant St. will be closed to through traffic
Posted on Tuesday, June 17, 2025 04:34 PM
No through access will be available for emergency vehicles.
Road closure and detour signs will be posted in accordance with provincial standards.
Access to J. Simko Plaza from Conant St. will be closed. Access for Residents, Business Personnel, and Shoppers will be maintained on Simcoe St.
When: June 30 to July 4, 2025
Where: between Margate St. and Simcoe St. S
Why: water service installation at 86 Conant St.
We apologize for any inconvenience this may cause.
For more information, please contact: Nathan...

Metrolinx Notice: Soil characterization work at Simcoe Street and Albert Street Bridge
Posted on Friday, June 06, 2025 11:00 AM
Metrolinx is preparing for the future Bowmanville Extension project, which will extend Lakeshore East GO rail service through Central Oshawa to Courtice and Bowmanville.
Why: XS Soil Solutions Inc. and its subcontractor (Strata Drilling Group) will be near Simcoe Street Bridge and Albert Street Bridge conducting soil characterization sampling. This geotechnical investigation is critical to help inform the design and construction planning of future infrastructure upgrades that will improve transit...
Road Closure: Windfields Farm Dr. W will be closed to through traffic
Posted on Monday, May 26, 2025 10:54 PM
No through access will be available for emergency vehicles.
Road closure and detour signs will be posted in accordance with provincial standards.
Local access to be maintained for retail space/Riocan shopping area north of roundabout -Riocan already provided notification to inform all their tenants
When: From June 2, 2025 until July 11, 2025
Where: Windfields Farm Dr. W - from Simcoe St. N to approx.130 m west of roundabout
Why: remove asphalt and replace, remove and replace the curbs, remove and...